I have a hefty slide out section, due to weight and track geometry being unsuitable for a lifting or hinged section. The images shows there are twin tracks on bridges at two levels. Rail alignment is currently by copper-clad sleepers and reliant upon the bridges not moving relative to each other.



Electrical connect is by way of plug together choc-blox which provide some firm alignment added to by lever over clamps.
My problem is the drawer can move a tad resulting in one or more 'corners' being misaligned enough for a derail. There is no way to use dowels as positive locators, nor loose hinge pins, etc. I would like to use those Micro-Tech keyed rail end locators but the slide out method makes that unlikely.
Any ideas from the collective mind are welcomed.